The new wall is up, and everything is where is should be! It only took 3 days to put the boards up – the hardest parts were cutting around light switches, outlets, and ceiling beams. The only thing missing is my “new” Vulcan kiln, which is at Vulcan right now being tested and prepped. It will live next to the Olympic kiln seen in the pictures.
The boards (on both sides of the studio) are from buildings on our farm that were torn down. My dad had finished the west wall (with the shelves) but was not able to finish the east wall before he died.
Time to pug some clay and get to work!